{"id":2088,"date":"2026-06-11T06:12:47","date_gmt":"2026-06-11T06:12:47","guid":{"rendered":"https:\/\/hydroalpslab.ch\/?p=2088"},"modified":"2026-06-11T06:21:43","modified_gmt":"2026-06-11T06:21:43","slug":"improving-the-flexibility-of-alpine-power-stations-results-of-the-smallflex-goms-project","status":"publish","type":"post","link":"https:\/\/hydroalpslab.ch\/en\/ameliorer-la-flexibilite-des-centrales-alpines-resultats-du-projet-smallflex-goms\/","title":{"rendered":"Improving the flexibility of Alpine power stations: results of the SmallFlex Goms project"},"content":{"rendered":"<p class=\"wp-block-paragraph\"><strong>Hidden storage within existing structures<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In Switzerland, <a href=\"https:\/\/www.newsd.admin.ch\/newsd\/message\/attachments\/58260.pdf\" target=\"_blank\" rel=\"noopener\">Small-scale hydropower generates around 3.4 TWh per year, with an estimated additional potential of 770 GWh<\/a>. However, these facilities play only a minor role in regulating the grid. The project explores an innovative approach: utilising \u00abhidden\u00bb hydraulic volumes (the upper sections of penstocks and pressurisation chambers) to absorb short-term power peaks. No extra concrete: just a smarter use of what already exists.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A survey of power stations between the source of the Rh\u00f4ne and Brig identified two priority sites: M\u00f6rel (three 17 MW Francis turbines) and Merezenbach (one 1.9 MW Pelton turbine). For each site, 1D\/3D simulations modelled transient conditions and assessed the risk of air entrainment, a phenomenon that occurs during partial drainage of the pipeline and can cause severe mechanical damage. These models were validated by scale model tests at ETH Zurich.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Successful on-site trials<\/strong> In March 2026, full-scale tests were conducted in M\u00f6rel by the Hydro Alps Lab using a multi-sensor data acquisition system and a Hydro-Clone digital twin to simulate the power station\u2019s behaviour in real time. Result: power fluctuations of 1 to 3 MW over 900 seconds were validated using a single turbine, in accordance with Swissgrid\u2019s primary control criteria (\u00b1200 mHz). FMV can now consider qualifying a unit for this service. At the Gletsch-Oberwald power station, which was studied during the previous SmallFlex project, the potential had been estimated at +130 kWh of winter production and +30,000 CHF\/year in additional revenue.<br><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"434\" src=\"https:\/\/hydroalpslab.ch\/wp-content\/uploads\/2026\/06\/SmallFlex_Goms_2026_Morel_ETHZ_HydroAlpsLab-1024x434.jpg\" alt=\"\" class=\"wp-image-2089\" srcset=\"https:\/\/hydroalpslab.ch\/wp-content\/uploads\/2026\/06\/SmallFlex_Goms_2026_Morel_ETHZ_HydroAlpsLab-1024x434.jpg 1024w, https:\/\/hydroalpslab.ch\/wp-content\/uploads\/2026\/06\/SmallFlex_Goms_2026_Morel_ETHZ_HydroAlpsLab-300x127.jpg 300w, https:\/\/hydroalpslab.ch\/wp-content\/uploads\/2026\/06\/SmallFlex_Goms_2026_Morel_ETHZ_HydroAlpsLab-768x326.jpg 768w, https:\/\/hydroalpslab.ch\/wp-content\/uploads\/2026\/06\/SmallFlex_Goms_2026_Morel_ETHZ_HydroAlpsLab-1536x651.jpg 1536w, https:\/\/hydroalpslab.ch\/wp-content\/uploads\/2026\/06\/SmallFlex_Goms_2026_Morel_ETHZ_HydroAlpsLab-2048x868.jpg 2048w, https:\/\/hydroalpslab.ch\/wp-content\/uploads\/2026\/06\/SmallFlex_Goms_2026_Morel_ETHZ_HydroAlpsLab-18x8.jpg 18w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"768\" src=\"https:\/\/hydroalpslab.ch\/wp-content\/uploads\/2026\/06\/SmallFlex_Goms_2026_HydroAlpsLab-1024x768.jpg\" alt=\"\" class=\"wp-image-2090\" srcset=\"https:\/\/hydroalpslab.ch\/wp-content\/uploads\/2026\/06\/SmallFlex_Goms_2026_HydroAlpsLab-1024x768.jpg 1024w, https:\/\/hydroalpslab.ch\/wp-content\/uploads\/2026\/06\/SmallFlex_Goms_2026_HydroAlpsLab-300x225.jpg 300w, https:\/\/hydroalpslab.ch\/wp-content\/uploads\/2026\/06\/SmallFlex_Goms_2026_HydroAlpsLab-768x576.jpg 768w, https:\/\/hydroalpslab.ch\/wp-content\/uploads\/2026\/06\/SmallFlex_Goms_2026_HydroAlpsLab-1536x1152.jpg 1536w, https:\/\/hydroalpslab.ch\/wp-content\/uploads\/2026\/06\/SmallFlex_Goms_2026_HydroAlpsLab-2048x1536.jpg 2048w, https:\/\/hydroalpslab.ch\/wp-content\/uploads\/2026\/06\/SmallFlex_Goms_2026_HydroAlpsLab-16x12.jpg 16w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Forecasts and hybrid virtual power plant<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The project has also developed a hydro-meteorological forecasting tool showing that water inflows can be predicted with 70% accuracy for D+1 planning, compared with around 50% for solar and less than 30% for wind power: a significant operational advantage.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Finally, a forward-looking section explores the creation of virtual power plants (VPPs) combining hydro, solar, wind and battery storage. Simulations show that such a VPP can increase its revenue by 2 to 6 % depending on market conditions and installed storage capacity.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The methodologies developed in the Goms Valley can be applied to all Alpine valleys. The full scientific article is published at <a href=\"https:\/\/www.bulletin.ch\/fr\/ameliorer-la-flexibilite-des-centrales-alpines\" target=\"_blank\" rel=\"noopener\">Bulletin.ch<\/a>. The SmallFlex Goms project is funded by the SFOE and coordinated by the Hydro Alps Lab at the <a href=\"https:\/\/www.hevs.ch\/fr\" target=\"_blank\" rel=\"noopener\">HES-SO Valais<\/a>, in partnership with the <a href=\"https:\/\/www.wsl.ch\/fr\/\" target=\"_blank\" rel=\"noopener\">WSL<\/a>, <a href=\"https:\/\/ethz.ch\/en.html\" target=\"_blank\" rel=\"noopener\">ETH Zurich<\/a>, the <a href=\"https:\/\/heig-vd.ch\/\" target=\"_blank\" rel=\"noopener\">HEIG-VD<\/a>, <a href=\"https:\/\/hdynamics.ch\/\" target=\"_blank\" rel=\"noopener\">HDE<\/a>, <a href=\"https:\/\/fmv.ch\/\" target=\"_blank\" rel=\"noopener\">GMF<\/a> and <a href=\"https:\/\/www.alpiq.com\/\" target=\"_blank\" rel=\"noopener\">Alpiq<\/a>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Article written by Benjamin Bouix<\/p>","protected":false},"excerpt":{"rendered":"<p>Un stockage cach\u00e9 dans les ouvrages existants En Suisse, la petite hydraulique produit environ 3,4 TWh\/an avec un potentiel suppl\u00e9mentaire estim\u00e9 \u00e0 770 GWh. Ces installations participent pourtant peu au r\u00e9glage du r\u00e9seau. Le projet explore une piste originale : exploiter des volumes hydrauliques \u00ab cach\u00e9s \u00bb (partie sup\u00e9rieure des conduites forc\u00e9es, chambre de mise [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":2090,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[11],"tags":[],"class_list":["post-2088","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-actualite"],"_links":{"self":[{"href":"https:\/\/hydroalpslab.ch\/en\/wp-json\/wp\/v2\/posts\/2088","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/hydroalpslab.ch\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/hydroalpslab.ch\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/hydroalpslab.ch\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/hydroalpslab.ch\/en\/wp-json\/wp\/v2\/comments?post=2088"}],"version-history":[{"count":2,"href":"https:\/\/hydroalpslab.ch\/en\/wp-json\/wp\/v2\/posts\/2088\/revisions"}],"predecessor-version":[{"id":2092,"href":"https:\/\/hydroalpslab.ch\/en\/wp-json\/wp\/v2\/posts\/2088\/revisions\/2092"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/hydroalpslab.ch\/en\/wp-json\/wp\/v2\/media\/2090"}],"wp:attachment":[{"href":"https:\/\/hydroalpslab.ch\/en\/wp-json\/wp\/v2\/media?parent=2088"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/hydroalpslab.ch\/en\/wp-json\/wp\/v2\/categories?post=2088"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/hydroalpslab.ch\/en\/wp-json\/wp\/v2\/tags?post=2088"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}